Outbuilding · Battle Ground, WA ·

80-Amp Feeder and Lighting for a New Pole Barn in Battle Ground, WA

A new pole building in Battle Ground got its own 80-amp feeder: 70 feet of #2 URD underground from the house panel, a fused AC disconnect at the barn, two ground rods, surge protection and LED lighting through the trusses.

Interior of a new pole barn in Battle Ground WA with LED strip lighting mounted between the exposed trusses, white steel liner panels and a polished concrete floor

Feeder

80-amp, 70 ft of #2 URD

At the Barn

100A fused disconnect, 80A fuses

Grounding

Two ground rods

Lighting

LED runs plus a high bay

Scope of Work

  • Landed an 80-amp Homeline breaker in the house panel
  • Ran 70 feet of #2 URD underground to the new pole building
  • Installed a 100-amp fused AC disconnect with 80-amp fuses at the barn
  • Drove two ground rods and bonded the structure
  • Installed surge protection and LED lighting through the trusses
  • Added exterior coach lighting at the personnel door

A pole building goes up fast and then sits dark until somebody runs power to it. This one in Battle Ground got a proper 80-amp feeder rather than a cord from the house, and Newman Electric handled the run, the disconnect, the grounding and the lighting.

Sizing the feeder to the building

Eighty amps is a deliberate number, landed on an 80-amp Homeline breaker at the house and protected again by 80-amp fuses in a 100-amp fused disconnect at the barn.

That combination is worth explaining, because it looks like belt and braces:

  • The breaker at the house protects the feeder itself over its 70-foot run
  • The fused disconnect at the barn gives a local means of disconnect, which a detached structure with its own distribution is required to have
  • The disconnect is rated 100 amps and fused at 80, which is normal: you size the enclosure to the frame and the fuses to the load

Seventy feet of #2 URD carries that comfortably. Conductor size on a feeder is set by the load, the distance and the voltage drop you are prepared to accept, and getting it wrong shows up as lights that dim every time something starts.

Two ground rods, not one

The building got two ground rods, and that is not belt and braces.

A single rod is only accepted where its resistance to earth is measured and proven low enough. Since almost nobody measures it, the practical rule is two rods, spaced, bonded together. On a rural Battle Ground lot with dry summer soil, that is the right call regardless of what a meter would say in February.

The structure is bonded, and the equipment ground runs with the feeder. Both are required, and a detached building relying on rods alone for fault clearing is one of the more dangerous shortcuts in the trade.

Lighting a truss ceiling

Inside, LED runs went up between the exposed trusses, with a high bay in the bay where the height called for it.

Pole barns are awkward to light because the trusses are both the obstruction and the mounting. Running linear LED along the truss line rather than trying to work around it gives even light down the length of the building, and it puts the fixtures where they can be reached from a ladder rather than a lift.

The exterior got a coach light at the personnel door, which is a small thing that gets used every single time somebody goes out there after dark.

Doing it while the building is empty

Every part of this was easier because the barn was new and empty. The trench had no landscaping to cross, the walls had nothing on them, and the ceiling was clear.

The same feeder and outbuilding work two years from now, with a shop full of equipment and a finished yard, is a materially more expensive job. Our guide to powering a detached shop or barn covers what to decide before the slab goes in.

Putting up a pole building around Battle Ground, Yacolt or Amboy? Call 360-828-7143 or size the feeder with us before the trench closes.

Property details

Rural Property Has Outbuilding

Real Reviews

What customers say about our outbuilding work

5.0 on Google · 115 reviews
My complex had this day blocked out for garage motion-detect lights installation. What we got was great, friendly service from Brandon who installed new wiring right to the box (no fire worries now!), a nice looking light and a thorough clean up. He said Newman does private work, too, so now “I have a guy” if I need electrical work in the future.
Matthew Kish
James did everything I expected and quickly with a minimum of power interruptions, which is important because my wife is on continuous supplemental oxygen and we had to use a tank for less than an hour while James completed the wiring. He hauled my 7.5K generator down to the garage and fired it up to test that all worked as needed. Thanks Newman and James.
John D. · Washougal, WA

Project Photos

More From This Job

Exterior of a new white and grey pole barn in Battle Ground WA with a coach light mounted beside the personnel door and gravel apron in front of the overhead door
Coach light at the personnel door, which is the light you actually use.
Two electrical panels open on a wall in a Battle Ground WA home showing the new 80-amp Homeline breaker landed to feed the pole barn
The house end: an 80-amp breaker feeding the whole building.
Interior of a new pole barn in Battle Ground WA seen through the open overhead door, with LED lighting running the length of the trusses
Looking back out through the overhead door with the lights on.

Planning a similar project?

Newman Electric serves Battle Ground and the rest of Clark and Cowlitz County, WA. Free estimates on every job.

View all recent projects