Panel Upgrade · Vancouver, WA ·

Two Panels Swapped in a Day in Vancouver, WA, Including an ITE Pushmatic

This Vancouver home had two aging load centers, one of them an ITE Pushmatic with push-button breakers. Both came off the wall in a single day, every circuit re-landed, with surge protection and a typed directory in the new hallway panel.

New electrical panel installed in the hallway of a Vancouver WA home with the door open, showing a typed circuit directory, a surge protective device with a status display, and every breaker labeled

Panels Replaced

Two, in one day

Removed

ITE Pushmatic load center

Added

Surge protection at the panel

On Site

About 7 hours

Scope of Work

  • Replaced two aging load centers on the same visit
  • Removed an ITE Pushmatic panel with push-button breakers from the garage
  • Re-landed every branch circuit from both panels
  • Added surge protection and a typed circuit directory in the hallway panel

Two panels, one house, one day. This Vancouver home had aging load centers in two places, a garage panel and a hallway panel, and Newman Electric replaced both on the same visit rather than making it two projects with two shutdowns.

What a Pushmatic actually is

The garage panel carried a blue ITE Pushmatic badge. If you have not seen one, they are unmistakable once you open the door: instead of a toggle, each breaker is a push button that you press to trip and press again to reset.

They were common through the middle of the last century and they have not been made in decades. The practical problems are all downstream of that:

  • Breakers are hard to source, and what you can find is used or new-old-stock at collector prices
  • The mechanism stiffens with age, and a breaker that is hard to push is a breaker whose trip behaviour nobody should be relying on
  • No AFCI or GFCI options exist in the format, so you cannot bring circuits up to current protection without leaving the panel
  • Testing is awkward, because there is no visible handle position telling you the state at a glance

None of that means a Pushmatic is failing today. It means the panel has no future, and every electrical improvement in the house runs through it. That is the usual argument for replacing an obsolete load center rather than working around one, and our guide to when an old load center has to go covers the other tells.

Why both panels came out together

Doing the two panels on one visit is not just convenience. On a house wired across two load centers, the circuits interact: feeders, shared neutrals from an earlier era, and a directory on each door that only makes sense next to the other one.

Replacing them together means the whole picture gets sorted once:

  1. One power outage for the household instead of two.
  2. Circuits get traced across both panels while everything is open and identifiable.
  3. The directories agree at the end, because they were written at the same time.

The typed directory is the deliverable

The hallway panel went back with a typed directory and a surge protective device sitting at the bus with its status showing through the door.

A directory sounds like a small thing next to the copper. It is the part the homeowner uses. Every future electrician, inspector and appliance install starts by opening that door, and a panel that is honestly labeled saves an hour of tracing every single time.

Old panel in a Vancouver home with push-button breakers, a fuse block, or a brand nobody stocks? Call 360-828-7143 or get both panels quoted at once.

Property details

Older Home (Pre-1980)

Real Reviews

What customers say about our panel upgrade work

5.0 on Google · 115 reviews
Very professional, responsive and right on schedule. Very clean job and quite reasonably priced, especially considering this was not a very big job. Ran 50 amp service from house panel to sub panel in shop.
Jerry K. · Battle Ground, WA
These guys were amazing. Came in and really knew what they were doing. Super friendly. Looked super nice when they were done.
Adrienne Sylvester

Project Photos

More From This Job

Original ITE Pushmatic load center mounted on a pegboard wall in the garage of a Vancouver WA home before replacement, with the blue Pushmatic badge visible on the dead front
The blue Pushmatic badge on the garage panel. Push-button breakers, and no longer made.
Second original electrical panel in a Vancouver WA hallway opened before replacement, showing crowded branch circuit conductors and aged breakers
The hallway panel before, with everything crowded into the middle.
New electrical panel installed in the garage of a Vancouver WA home in the same pegboard opening the old Pushmatic occupied, with conductors landed neatly on the bus
New panel back in the same opening in the garage.

Planning a similar project?

Newman Electric serves Vancouver and the rest of Clark and Cowlitz County, WA. Free estimates on every job.